

Kitchen in a Czech-project block
ObolonMoved the sink towards the window, boxed in the gas pipe, replaced the floor and the fronts.
7 m²Full renovation5 weeks
Renovation studio · Kyiv
Survey, design, the works and the clean-up after us. The price is fixed in the contract, and every Friday you get a photo report.


01 · Work
We shoot every pair from the same spot: before the first hammer drill and after the clean-up. That way the difference shows without retouching.


Moved the sink towards the window, boxed in the gas pipe, replaced the floor and the fronts.
7 m²Full renovation5 weeks


From a bare concrete shell: screed, wiring for 38 points, a kitchen-living room and a bed alcove to the design.
38 m²Design-led12 weeks


Stripped to bare concrete: new pipes, a concealed cistern and large-format tiles with no visible cuts.
4 m²Full renovation4 weeks


Levelled the walls for paint, restored the oak parquet and kept the original ceiling cornice.
18 m²Cosmetic6 weeks


Soundproofing on the wall shared with the neighbours, soft lighting and paint that washes off felt-tip.
14 m²Cosmetic4 weeks


A wall-to-wall sliding wardrobe, new doors and a floor that shrugs off wet boots.
9 m²Cosmetic3 weeks
02 · Services and prices
Prices cover labour and rough materials. You choose the finishes — on your own or from our supply list at supplier prices.
fromUAH 3,900/m²
For an apartment whose layout already works: we refresh the walls, ceiling and floor without moving any services.
Time for 50 m²3–5 weeks
EstimatefromUAH 7,800/m²
We strip everything back to concrete and rebuild the apartment with new wiring, new pipes and straight walls.
Time for 50 m²9–12 weeks
EstimatefromUAH 11,500/m²
Drawings and renders of every room come first, then the renovation follows them exactly, with the designer supervising.
Time for 50 m²14–18 weeks
Estimate03 · Calculator
A ballpark in a minute. The exact figure goes into the contract after a free survey.
Cost of the work
UAH 451,000–518,000
This is a ballpark: ±7% depending on the walls, the ceiling height and the floor.
04 · Process
We come with a laser measure, photograph every wall and tell you on the spot where the problems are hiding.
1 day, free
We price every item down to the skirting. The estimate becomes an annex to the contract and never changes again.
3 days
Layout, drawings for the crew and renders. For a cosmetic job it is just a plan of sockets and lights.
1–4 weeks
A site manager on site every day, a photo report every Friday, payment in stages and only after sign-off.
from 3 weeks
We walk through an 84-point checklist together, clean up and hand you a 3-year warranty.
1 day
05 · Reviews
We lived in the next room for all eleven weeks. Photos every Friday, a clean flat every evening. The estimate didn't move by a single hryvnia.
We only wanted new tiles, but at the survey the site manager found a rotten pipe behind the wall. It went into the estimate straight away, not as an extra halfway through.
We got the keys to a bare concrete shell in March and had the housewarming in July. The furniture fitted the alcoves from the drawings exactly.
06 · FAQ
Nothing. The survey and the estimate are free, even if you end up choosing another studio.
No. The estimate is an annex to the contract. If you decide to add work, we agree it in writing before it starts.
For a cosmetic job, yes — we go room by room. For a full renovation it is better to move out: water and power are off for a few days.
Whatever suits you: we source them at supplier prices or work with yours. Rough materials are always on us.
Three years on all work. If a crack or a leak appears through our fault, we fix it for free.
Every Friday we send a photo report to Telegram or Viber: what is done, what comes next and whether the dates hold.
07 · Contact
We call back within a working day, agree a time and come over with a laser measure.
This site is a portfolio project, so the request went nowhere. In a real project it would reach a manager's Telegram within a second.